• Tall ships docked at Fort Trumbull during OpSail 2012.

  • The Coast Guard Barque Eagle docked at its home port in New London.

  • The Thames Base Ball Club of New London plays vintage ball at Fort Trumbull.

  • Crowds enjoy the surf and Summer sun at Ocean Beach Park.

  • Art lovers enjoy work at the annual Salon des Independants at Hygienic Galleries.

  • A fish-eye's view of the majestically renovated Garde Arts Theater.

  • A community parade passes City Hall on State Street.

  • A bustling Waterfront Park during SailFest.

  • A lone tug passes Harbor Light on a foggy day on the Thames River.

  • The Reducers rock the boardwalk at Ocean Beach.

GOVERNMENT

CONTACT US

New London City Hall
181 State Street
New London, CT 06320

PHONE (860) 447-5200
HOURS Monday-Friday
8:30 a.m. - 4:00 p.m.

 

NOTICE TO INTERESTED PARTIES

Potential bidders/offerors that choose to download a solicitation from this website are solely responsible to regularly visit the site to check for any addenda that may be issued prior to the closing date of the solicitation.  Failure to check the site and submit a signed copy of the addenda with your offer/bid will render your offer/bid to be non-responsive and excluded from any consideration.

 

UNLESS OTHERWISE INDICATED, ALL BIDS WILL BE PUBLICLY OPENED AND READ ALOUD AT 2:00 P.M. ON THE BID DUE DATE LISTED BELOW.

UNLESS OTHERWISE INDICATED, ALL PRE-BID MEETINGS WILL BEGIN AT 10:00 A.M.  THE LOCATION OF THE PRE-BID MEETING IS SPECIFIED IN EACH BID.

 

Bid No.

TITLE

DUE DATE

Pre-Bid Meeting 
2023-13 CONL

Environmental Services for 43 Hempstead Street

RFP Documents

Addendum 1

Addendum 2

May 19, 2023 @ 2:00 P.M.

MANDATORY

April 27, 2023 @ 2:30 P.M. OR April 28, 2023 @ 9:30 A.M. (must only attend one of the two)

Meet at 43 Hempstead St., New London, 06320

2023-12 CONL

REBID Bank Street Sidewalk Improvements

RFP Documents

Addendum 1

Addendum 2

June 12, 2023 @ 2:00 P.M.

MANDATORY

May 22, 2023 @10:00 A.M.

Meet promptly at 111 Union Street, New London, CT 06320

2023-12 CONL

Bank Street Sidewalk Improvements

RFP Documents

Addendum 1

Addendum 2

April 26, 2023 @ 2:00 P.M.

MANDATORY

April 5, 2023 @ 10:00 A.M.

Meet at 111 Union Street, New London, CT 06320

2023-11 CONL

Stage Area Heating System Renovations at the Garde Arts Center

RFP Document

Addendum 1

June 15, 2023 @ 2:00 P.M.

Bids MUST be delivered to 13 Masonic Street- do NOT deliver to The Garde

May 31, 2023 @ 10:00 A.M.

Meet promptly at The Garde Arts Center located at 325 State Street, New London, CT 06320

2023-10 CONL

Williams & Broad Street Test Pits

IFB Documents

Addendum 1

Addendum 2

April 3, 2023 @ 2:00 P.M.

April 11, 2023 @ 2:00 P.M.

MANDATORY

March 20, 2023 @ 10:00 A.M.

Meet at 111 Union Street, New London, CT 06320

2023-09

NLPA Operations and Management

RFQ/P Documents

Addendum 1

Addendum 2

Addendum 3

Addendum 4

April 27, 2023 @ 2:00 P.M.

MANDATORY- TO BE HELD VIRTUALLY

March 28, 2023 @ 10:00 A.M.

See Addendum 2 for Zoom link

Meet at 181 State Street, 3rd Floor, New London, CT 06320

2023-08

Roof Replacement at Water Street Garage

IFB

Addendum 1

March 22, 2023 @ 2:00 P.M.

MANDATORY

March 1, 2023 @ 11:00 A.M.

Meet at 160 Water Street, New London, CT 06320

2023-07

ADA Improvements at Water Street Garage

IFB

Addendum 1

Addendum 2

March 22, 2023 @ 2:00 P.M.

MANDATORY

March 1, 2021 @ 11:00 A.M.

Meet at 160 Water Street, New London, CT 06320

2023-06

Abandoned Vessel

IFB

Addendum 1

Addendum 2

Addendum 3

Addendum 4

Addendum 5

Addendum 6

March 8, 2023 2:00 P.M.

MANDATORY

February 22, 2023 10:00 A.M.

meet at: 2 State Street, NL, 06320

CANCELLED

2023-05

Wyland Wall Restoration

RFP

Addendum 1

Addendum 2

January 5, 2023 2:00 P.M.

MANDATORY

December 22, 2022

2023-04

On-Call Consulting Services

RFP/Q

Addendum 1

Addendum 2

Addendum 3

Addendum 4

January 23, 2023 2:00 P.M. N/A
2023-03

Broadband Feasibility Study

RFP/Q

Addendum 1Addendum 4

Addendum 2Addendum 5

Addendum 3

November 29, 2022 2:00 P.M. N/A
N/A

Downes Construction- Subcontractors for Community Center

Notice

Addendum #1

October 18, 2022 2:00 P.M. N/A
2023-02

City Hall Exterior Facade Repair

IFB PackageAddendum #5

Addendum #1Addendum #6

Addendum #2

Addendum #3

Addendum #4

August 23, 2022 2:00 P.M.

August 30, 2022 2:00 P.M.

MANDATORY

August 1, 2022 @ 2:30 P.M. OR August 2, 2022 @ 9:30 A.M.

August 8, 2022 @ 2:30 P.M. OR

August 9, 2022 @ 9:30 A.M.

2023-01

Marina Lot Tree Planting

IFB PackageContract

Addendum #1Bid tabulation

August 23, 20222:30 P.M.

August 25, 2022 at 2:00 P.M.

MANDATORY

August 2, 2022

August 25, 2022 @ 2:00 P.M.

Meet at 111 Union Street to sign-in at 9:45 A.M.

2022-11

Bennie Dover Jackson Middle School- Technology (State Project 095-0091 MAG/EA)

IFB PackageContract- TE-04

Addendum #1

Addendum #2Bid tabulation

Addendum #3

August 4, 2022 2:00 P.M.

August 11, 2022 2:00 P.M.

Non-Mandatory

July 14, 2022 10:00 A.M.

2022-10

2023 Reappraisal and Revaluation

RFP PackageContract

Addendum #1Bid tabulation

July 27, 2022 2:00 P.M. N/A
2022-09

Bennie Dover Jackson Middle School Facade repair

RFP PackageContract

Addendum #1Bid Tabulation

July 13, 2022 2:00 P.M. N/A
2022-08

Jefferson at Chester Street Roundabout

RFP Package

Addendum#1

Addendum #2

 Addendum #3

 Addendum #4

June 21, 2022 2:00 P.M.

MANDATORY

June 1, 2022 10:00 A.M.

(meet at 111 Union Street first to sign-in)

2022-06

Social Media Services

RFP Package

Addendum #1

Addendum #2

February 22, 2022

March 1, 2022

2:00 P.M.

N/A
2022-05

Water Street at Ferry Street Signal Improvement

RFP PackageAddendum #3

Addendum #1Contract

Addendum #2Bid Tabulation

April 5, 2022

2:00 P.M.

MANDATORY

March 21, 2022

10:00 A.M.

2022-04

Construction Manager at Risk- Community Center

RFP/Q PackageAddendum #5

RFP/Q Package with dividers

Addendum #1

Addendum #2

Addendum #3

Addendum #4

October 29, 2021

November 5, 2021

2:00 P.M.

MANDATORY

October 8, 2021

2022-03

City Hall Painting

RFP/Q Package

Addendum #1

August 31, 2021

2:00 P.M.

MANDATORY

August 17 or 18, 2021 10:00 A.M.

 

2022-02

City Hall Plaster repair and restoration

RFP/Q Package

Addendum #1

August 31, 2021

2:00 P.M.

MANDATORY

August 17 or 18, 2021 10:00 A.M.

2022-01

Shaw's Cove Bulkhead Repairs of the Metal Retaining Wall

RFP PackageAddendum #2

Addendum #1

September 1, 2021

2:00 P.M.

MANDATORY

August 17, 2021

2021-15

Municipal Vault Expansion- Demo masonry, steel support, plaster restoration

RFP PackageProposalsContract

Addendum 1Prevailing Wages

June 9, 2021

2:00 P.M.

May 24 and 25, 2021

*By appointment

 

2021-14

Community Center- Architect/Engineer

RFP PackageTechnicalProposals

Addendum 1Fee Proposals

Addendum 2Newspaper posting

Addendum 3State site posting

Addendum 4

June 11, 2021

2:00 P.M.

Non-mandatory

Virtual 5/21/2021

2021-13

Repairs and Improvements at the Marina Parking Lot

RFP PackageProposalsContract

Addendum 1The Day postingBid Tabulation

State website posting

July 1, 2021

2:00 P.M.

MANDATORY

June 14, 2021

2021-12

Multi-Use Trail

RFP PackageProposalsContract

Addendum 1The Day postingBid Tabulation

State website posting

June 8, 2021

2:00 P.M.

MANDATORY

5/25/2021

2021-11

Wayfinding Signage

Specifications

Addendum

Addendum 2

May 28, 2021

June 4, 2021

2:00PM

N/A

 

2021-10 Rebid

 

Furniture, Fixtures and Equipment as well as Technology for New London High School- North Campus. State Project 095-0090 RNV/MAG/EA

Specifications&Drawings

 

April 15,2021 12:00 PM

N/A

2021-10

Furniture, Fixtures and Equipment as well as Technology for New London High School- North Campus. State Project 095-0090 RNV/MAG/EA

Specifications

Drawings

Addendum 1

Addendum 2

Addendum 3

Addendum 4

**Please note the information in the above links are for reference only. Official documents should be obtained from the printer.**

March 1, 2021 @ 2PM Non-Mandatory Feb. 10, 2021 @ 2:00PM
2021-09

Move Management for New London High School- North Campus. State Project 095-0090 RNV/MAG/EA

Exhibit DExhibit E

Addendum 1Phasing 1

Phasing 2

March 8, 2021 @ 12PM Non-Mandatory Feb. 10, 2021 @ 2:30PM
2021-08

New Business Venture- Waterfront Promenade

Attachment 1

Attachment 2

Attachment 3

March 8, 2021 @ 2PM By appointment
2021-07

Abatement and Demolition of Thames River Apartment Complex

Addendum 1

Former Thames River Apt. Complex HBMA Report 11.18.2020

 Thames River Apartments Record Drawings

Walk Through Attendance List 2.26.21.pdf

Submissions

March 9, 2021 @ 2P.M.

 

Mandatory February 16, 2021 @ 10A.M.
2021-06

Social Media Services

Addendum 1

November 16, 2020 @ 2PM
2021-05

Video Production Services

Addendum 1

November 16, 2020 @ 2PM
2021-04

BJMS Alteration and Extension Project Phase 2

State Project 095-0091

https://securecc.smartinsight.co/#/PublicBidProject/532205

Addendum 1

 Addendum 2

 Addendum 3

Addendum 4

 Addendum 5

October 30, 2020 @ 2:00PM

See Addendum 3 for due due date based on bid package.

October 21, 2020 @ 10:00AM

2021-01

 

Williams Street Improvements State Project 094-258

Project ManualAddendum 1

Construction Plans 1

Construction Plans 2

October 27, 2020 @ 2:00PM

November 3, 2020 @ 2PM

2021-03

See additional attachments

Intersection Improvements Tilley St. at Green St. and Bank St. State Project 094-260

ADDENDUM 1ADDENDUM 2

Attachment 1Attachment 4

Attachment 2Special Provisions

Attachment 3Plan Set

October 20, 2020 @ 2:00PM
2021-02

Riverside Park Fencing

Addendum #1

September 3, 2020 @ 2:00PM August 17, 2020 @ 10:00AM
2020-20

Virtual Net Meeting Offtake from Solar Projects in Eversource Territory for the City of New London

Addendum #1

July 24, 2020 @ 5:00PM
2020-16 (Re-Post)

Third Party Code Reviewer for Bennie Dover Jackson Middle School (095-0091 MAG/A).

Sample Contract

 

June 1, 2020 @ 2:00PM
2020-19

City Hall Council Chamber A/V Upgrades

Addendum #1

Addendum #2

May 15, 2020 @ 2:00PM

May 22, 2020 @ 2PM

Mandatory walk through by appt April 28 to 30, 2020 see RFP for details
2020-18

On-Call Sidewalk Replacement

Addendum #1

 

April 22, 2020 @ 2:00PM
2020-17

Construction Inspection Services State Project 094-260

Standard required forms

Plans(some minor changes may occur)

 

May 5, 2020 @ 2:00PM
2020-16

Third Party Code Reviewer for Bennie Dover Jackson Middle School

Addendum #1

 

May 5, 2020 @ 2:00PM

 

2020-15

Independent Testing Services for New London High School

Exhibit CExhibit DAddendum 1

Exhibit EExhibit FAddendum 2

Exhibit GNL Forms

 

March 27, 2020 @ 2:00PM

April 3, 2020 @ 2PM

2020-14

NLHS Stormwater General Permit Inspections & Monitoring Services

Documents

Addendum 1

Addendum 2

Addendum 3

 

 

March 27, 2020 @ 2:00PM

April 3, 2020 @ 2PM

2020-13

NLHS Phase 3 Construction

Addendum 1

Addendum 2

Addendum 3

Addendum 4

Addendum 5

Addendum 6

Addendum 7

Addendum 8      

March 26, 2020 @ 2:00PM

March 31, 2020 @ 2:00PM

See Addendum 8

Re-Post of Roofing and Landscaping

Due June 18, 2020 @ 2PM

March 11, 2020 @ 3PM NLHS Lobby
2020-06 Repost

Hodges Square Lighting Project

 

March 31, 2020 @ 2PM

2020-11

 

Environmental Services- Lead Hazard Reduction Program February 27, 2020 @ 2:00PM
2020-10 School Bus Parking Lease February 13, 2020 @ 2:00PM
2020-09

New London Waterfront Repairs & Maintenance

Exhibit A

Addendum 1

Addendum 2

 

February 19, 2020 @ 2:00PM

February 21, 2020 @ 2:00PM

2020-08 Middle School Enrichment January 30, 2020 @1:00PM Optional- January 23, 2020 @ 4:30PM at Bennie Dover Jackson Middle School
2020-06

Hodges Square Lighting Project

Addendum 1- Issued 12/3/19

December 3, 2019 @ 2:00PM

Deadline extended to December 20, 2019 @ 2:00PM

2020-05
Five Year Consolidated Plan for Housing and Community Development for Fiscal Years 2020-2024 November 14, 2019 @ 2:00PM
2020-04

Independent Structural Engineering Consultant for NLHS

Addendum 1- Issued 10/7/2019

 

October 11, 2019 @ 2:00PM
2020-03

Third Party Code Compliance Review for NLHS

Addendum 1- Issued 10/7/2019

 

October 11, 2019 @ 2:00PM
2020-02

BDJMS Phase 1 Corridor Ceiling Removal

Addendum 1- Issued 9/23/2019

Addendum 2- Issued 9/24/2019

September 26, 2019 @ 2:00PM

Updated due date:

October 1, 2019 @ 2:00PM

September 20, 2019 @ 11:00AM

Attendance is recommended but not mandatory.

2020-01
Old Town Mill Water Wheel Repair August 2, 2019 @ 2:00PM Mandatory walk through by appt July 12 to 19, 2019
2019-23

Traffic Signal Upgrade

Addendum 1- Issued 6/28/19

2017 Transportation Study

2017 Transportation Final

 

July 8, 2019 @ 2:00PM

2019-21 RFP

Commissioning Agent for BJMS

Addendum 1- Issued 6/17/2019

 

 

June 20, 2019 @ 2:00PM
2019-22 RFP
Solar Photovoltaic Projects, Ground Leases June 3, 2019 @ 5:00PM
2019-19 RFP

Watershed Management Plan

Addendum 1 - Issued 4/5/2019

April 18, 2019 @ 2:00PM

 

2019-18 RFP

Hazardous Building Materials Inspection, Testing, Design & Abatement/Remediation Monitoring Services for Bennie Dover Jackson Middle School Renovations and Additions (State Project No. 095-0091 MAG/A)

Addendum 1 - Issued 4/8/2019

April 11, 2019 @ 2:00PM

April 4, 2019 @ 3:00PM

Attendance is Recommended, but not Mandatory

 

2019-17

Student Transportation Service

Addendum 1 - Issued 3/28/19

Addendum 2 - Issued 4/2/19

 

April 8, 2019 @ 2:00PM March 25, 2019 @ 10:30AMAttendance is Mandatory
2019-16 RFQ

Construction Management Services for Bennie Dover Jackson Middle School Renovations and Additions (State Project No. 095-0091 MAG/A)

Addendum 1 - Appendix A & Appendix B

Addendum 2 - Issued 4/12/2019

March 11, 2019@ 2:00PM

February 27, 2019 @ 3:00PM

Attendance is recommended, but not mandatory

 

2019-15

New London High School - Phase 2 Early Haz-Mat Package

Project Manual - Volume 1 of 2

Project Manual - Volume 2 of 2

Haz-Mat Bid Drawings

Bulletin #1

Bulletin #2

 

February 26, 2019 @ 2:00PM

February 19, 2019 @ 3:00PM

Attendance isstronglyrecommendedbut not mandatory

2019-14 Lease of Office Space February 25, 2019 @ 3:00PM
2019-13

Community Recreational Facility - Architectural & Engineering Design Services

 

February 25, 2019 @ 2:00PM
2019-12

Aitchison Drive Water Main

Project Manual

Plans

 

May 1, 2019 @ 2:00PM

2019-10

 

OBP Asbestos Abatement December 14, 2018 @ 2:00PM
2019-09 RFQ/P

Commissioning Services for New London High School - North Campus (095-0090 MAG/N)

Addendum 1 - Cover Sheet- Issued 12/10/18

Addendum 1 - Project Schedule

Addendum 1 - Construction Phasing Diagrams

Addendum 2 - Answers to Bidders' Questions- Issued 12/21/18

 

January 2, 2019 @ 2:00PM December 10, 2018 @ 10:00AM
2019-08 RFQ

Architectural and Engineering Services for Bennie Dover Jackson Middle School Renovations and Additions (State Project No. 095-0091 MAG/A)

Addendum 1 - Answers to Bidders'Questions- Issued 12/7/18

 

December 12, 2018 @ 2:00PM December 4, 2018 @ 2:30PM
2019-07 RFQ/P

Phase1 and Phase 2 Environmental Site Assessment for the New London High School - North Campus (State No. 095-0090N)

Exhibit D - Site Topographic Survey

Exhibit E - Overall Existing Site Conditions

Exhibits F-M

Addendum 1 - Cover Sheet- Issued 11/27/18

Addendum 1 - NLHS UST Findings Report

Addendum 1 - Lead Determination - NLHS Firing Range

Addendum 1 - Hazardous Materials Opinion of Abatement Costs

Addendum 2 - Additional Information for Bidders- Issued 11/27/18

Addendum 3 - Map & Street Card for NLHS- Issued 11/28/18

Addendum 4 - Answers to Bidders' Questions- Issued 12/3/18

Addendum 5 - Answer to Question 9- Issued 12/3/18

 

December 7, 2018@ 2:00PM November 26, 2018 @ 10:00AM
2019-06

Depository and Banking Services

Addendum1 - Answers to Bidder's Questions- Issued 12/6/18

Addendum 2 - Answers to Bidder's Questions 3 & 4- Issued 12/10/18

Addendum 3 - Answers to Bidder's Questions 5 - 8- Issued 12/11/18

 

December 13, 2018 @ 2:00PM
2019-05

Green Harbor Beach and Pequot Avenue Storm Drainage (Re-Bid)

Special Provisions - Construction Documents

Prevailing Wage Rates

Drawings

Addendum 1 -Issued 10/22/2018

 

November 1, 2018 @ 2:00PM

October 11, 2018 @ 10:00AM -Mandatory

2019-04

Bank Street Roadway Sealcoating

Addendum 1 -Issued 8/31/2018

September 6, 2018 @ 3:00PM
2019-03

Bogue Brook Reservoir Dam Rehabilitation

Table of Contents

Division 1

Division 2

Division 3

Division 5

Division 11

Bogue Brook Drawings

Prevailing Wage Rates

Addendum 1 -Issued 8/13/2018

Addendum 2 -Issued 8/13/2018

Addendum 3 -Issued 8/23/2018

Addendum 4- Issued 8/24/2018

Addendum 5 - Issued 8/31/2018

Addendum 6- Issued 8/31/2018

September 5, 2018 @ 2:00PM

August 6, 2018 @ 10:00AM -Mandatory

2019-02

NLPD Detention Center Refurbishment

Addendum 1 -Issued 8/29/2018

 

September 6, 2018 @ 2:00PM August 22, 2018 @ 10:00AM -Mandatory
2019-01

Redevelopment/Placemaking Project

Addendum #1 -Issued 7/27/18

July 30, 2018 @ 2:00PM
2018-10

2018 Roadway Resurfacing Improvements

 

July 12, 2018 @ 2:00PM July5, 2018 @ 9:00AM -Mandatory
2018-11

Green Harbor Beach and Pequot Avenue Storm Drainage

Special Provisions - Construction Documents

Drawings

Addendum #1 -Issued 8/2/2018

Addendum #2-Issued 8/8/2018

Addendum #3- Issued 8/10/2018

Addendum #4 -Issued 8/14/2018

August 16, 2018 @ 2:00PM

August 7, 2018 @ 10:00AMMandatory

2018-08 Underground Storage Tank Removal and Replacement Services at New London Police Station, 5 Governor Winthrop Blvd THIS BID HAS BEEN CANCELLED June 18, 2018 @ 10:00AM -Mandatory
2018-07

Restoration Services for the Water Street Garage

Specifications & Drawings

 

August 7, 2018 @ 2:00PM

2018-06

New London High School - Track Resurfacing State Project #095-0090-MAG/N, Phase 1 of 4

Bid Specifications

Drawings

Drawing #11 L-303

Addendum #1-Issued 5/14/2018

Addendum #2 - Revised Bid Due Date -Issued 5/16/2018

 

RevisedDue Date

May 22, 2018 @ 2:00PM

May 9, 2018 @ 3:00PM - Not mandatory, butstronglyrecommendedto attend
2018-05

Owner's Representative Services for the Design, Renovation and Expansion of Bennie Dover Jackson Middle School, (State Project No. 095-0091 New London High School - South Campus)

Addendum #1 -Issued 5/22/2018

May 25, 2018 @ 2:00PM

May 15, 2018 -Mandatory Please arrive by2:45PM. Site Visit begins at 3:00PM.

 

2018-04 Winthrop Expanded Learning Time: Enrichment Opportunities May 7, 2018 @ 1:00PM

May 1,2018 @ 4:30PM- Optional

2018-03 Re-Bid

Bank St. Improvements (Re-Bid) -Issued 2/26/2018

Drawings #1-11

March 19, 2018 @ 2PM March 5, 2018 @ 9AM
2018-02 Re-Bid

Bartlett Park Basketball Court Reconstruction (Re-Bid) -Issued 2/22/2018

Drawings #1-5

March 28, 2018 @ 2PM February 28, 2018 @ 9AM
2018-03

Bank St. Improvements

Drawings #1-14

Addendum #1-Issued 1/19/2018

Addendum #2-Issued 1/19/2018

Addendum #3- Issued 1/25/2018

 

January 31, 2018 @ 2PM January 9, 2018 @ 8AM

2018-02

 

2018-02 Revised

 

Bartlett Park Basketball Court Reconstruction

Drawings #1-5

Revised Bid Package & Drawings -Issued 1/12/2018

 

 

January 30, 2018@ 2PM December 6, 2017 @ 8AM

2018-1 RFQ

Concept Drawing

Williams Street Improvement Project

Document #1

Document #2

December 11, 2017 @ 2PM
2017-21

City Hall Exterior Restoration-New 6/7/2017

Project Manual & Specifications

Project Plans & Drawings

Addendum #1-Issued 6/21/2017

Addendum #2- Issued 6/30/2017

July 12, 2017 June 21, 2017
2017-20 Construction Inspection Services (re-bid) Ocean Avenue Project -Issued 5/16/2017 May 31, 2017 @2:30pm
2017-10

Ocean Avenue Roadway Reconstruction (Re-Bid) CT State Project #L094-0001 -Issued 5/04/2017

Project Manual & Specifications

Plans & Drawings

May 31, 2017
2017-18

Toby May Park Handball Wall Construction -Issued 4/24/2017

Plan & Elevation Drawing #1

Plan Drawing #2

Addendum #1-Issued 5/11/2017

May 16, 2017 May 4, 2017
2017-17

Toby May Park Tennis & Basketball Courts Reconstruction -Issued 4/24/2017

Site Layout Plan

Addendum #1-Issued 5/11/2017

May 16, 2017 May 4, 2017
2017-16 Winthrop School - Extended Learning Time Enrichment May 8, 2017 @1:00pm April 25, 2017 @4:30pm

2017-15

Addendum #1

Reappraisal & Revaluation for the October 1, 2018 Grand List -Issued 4/11/2017

Answers to Bidders Questions -Issued 5/24/2017

 

June 2, 2018 @11:30am

2017-14

 

 

Addendum #1

Fulton Park Storm Drainage Repairs -3/29/2017

Drawing #1

Drawing #2

Answers to Bidder Questions &Topography and Construction Plan Map-Issued 4/24/2017

April 27, 2017 April 5, 2017
2017-09 Second Request Operator for Docking March 30, 2017 @12:00 Noon
2017-13 Sport Complex Scoreboards -3/01/2017 March 17, 2017

2017-12

 

Addendum #1

Foodservice Equipment - Nathan Hale Ovens -3/01/2017

Answers to questions -Issued 3/16/2017

March 23, 2017
2017-11 Auditing Services -Issued 2/14/2017 March 16, 2017

 2017-08 Re-Bid

 

 

 

Addendum #1

Sludge Storage Tank Rehabilitation Project -Issued 2/10/17

Project Manual & Specifications- Issued 2/10/17

Plans & Drawings

Answers to questions -New 2/17/17

February 24, 2017
2017-09 RFQ Operator for Docking -Issued 1/18/17 February 8, 2017 @ 12:00 Noon

2017-08

Terms & Conditions Documents

 

Addendum #1

Sludge Storage Tank Rehabilitation Project-Issued 1/10/17

Project Manual & Specifications

Plans & Drawings

 

Notice of changes to the Contract Documents as identified in Attachment 1-Issued 1/27/2017

February 3, 2017 January 18, 2017
2017-06 RFP - Energy Conservation Project - Energy Savings Performance Contract January 24, 2017

2017-05

 

 

Addendum #1

Veteran's Memorial Field Improvements

Project Manual & Specifications

Site Drawings

Response to Bidder Questions -Issued 1/17/17

Drawing: ENV-2 Contaminated Fill Areas

Drawing: ENV-3 Remediation Grading Coordination

Drawing: New 3515CE

January 20, 2017 January 9, 2017 @ 10:00am
2017-07

City Hall Historic Restoration

 

IFB with Specifications Manual

Plans & Drawings:Part I,Part II&Part III

Addendum #1

Addendum #2

Addendum #3

Addendum #4

Addendum #5-Issued 1/9/17

Addendum #6- Answers to final questions -Issued 1/17/17

January 19, 2017 November 30, 2016 @ 10:00 am

2017-04

 

 

Addendum 1

 

Addendum 2

Ocean Avenue Roadway Reconstruction

Bid Specifications

Plans & Drawings

Base Bid; Section 01270; Section 01400; Section 03302; and responses to bidder questions as of 10/5/2016

Responses provided to contractor submitted questions as of 10/13/2016

October 19, 2016
2017-02 Roadway Construction Inspection Services September 13, 2016
2017-03 City Hall Lighting Restoration September 6, 2016 August 18, 2016 @ 2:00pm
2017-RCDA

Environmental Remediation Brownfields Howard St.

Bid Specifications

August 10, 2016 July 27, 2016
2016-17 C.B. JenningsExpanded Learning Time: Enrichment Opportunities July6, 2016 @ 1:00pm June 28, 2016 @ 3:00pm
2016-16 New London Public Schools - Out-of-School Child Care Program June 30, 2016
2016-15 Recreational/Bike Trail - Professional Design Services July 1, 2016

2016-14

 

 

Addendum #1

Addendum #2

Addendum #3

Eugene O'Neill Drive Parking Lots Reconstruction

Technical Specifications Manual

Plan Set

Answers to Bidder Questions

State of Connecticut Prevailing Wage Rates

Answers to Additional Bidder Questions

Revised Sheet C-03.1

Revised Sheet C-03.02

Revised Sheet D-02.2

May 18, 2016 May 9, 2016

2016-13

 

Addendum #1

New London Public Schools - Student Transportation Services

Answers to Questions

June 6, 2016

2016-12

Winthrop Expanded Learning Time: Enrichment Opportunities

May 9, 2016; @1:00 pm

April 26, 2016; 3:00 pm - optional

2016-11

 

 

 

 

 

 

Addendum #1

Shaw's Cove Retaining Wall Replacement - Analysis and Design Services

Inspection Report - 12-31-2011

Supplemental Drawing #1

Supplemental Drawing #2

Supplemental Drawing #3

Supplemental Drawing #4

Answers to Questions

May 17, 2016

April 28, 2016

 

2016-10

 

Addendum #1

Pequot Avenue Storm Drainage - Design Services

Plans & Drawings

Answers to Questions

April 7, 2016
2016-09

Richard Martin Center Roof Renovations & Replacement

Project Manual

Plans & Drawings

April 12, 2016 April 5, 2016

2016-08

Addendum #1

LOTCIP Application

 

 

 

 

 

 

Ocean Avenue Reconstruction - Design Services

Site Plan Cover

Site Plan - pg 1 of 4

Site Plan - pg 2 of 4

Site Plan - pg 3 of 4

Site Plan - pg 4 of 4

Site Plan Details

February 11, 2016; 2:00 pm

 

 

2016-04

Greyhound Bus Station Relocation

Drawing #2

Drawing #3

Drawing #4

September 30, 2015

2016-07RFQ-P

Exhibit K:

A133-2009

A201-2007

Exhibit L:

E203-2013

Addendum 1

 

Addendum 2

New London HS Campus Project - Construction Management at Risk Services

CM Agreement

General Conditions

 

AIA Digital Practice Documents

 

Extendedduedate, responses to bidders' questions, andsubmission forms in Wordformat

Responses to Turner Construction Company not issued in Addendum 1,sample PLA document, and Exhibit A changes.

Friday, September 25, 2015 @ 2 p.m.

 

August 31, 2015 @ 2:30pm
2016-06 Tree Trimming & Removal Services August 25, 2015
2016-05 Street Trees August 27, 2015

2016-03

Bid Doc #2

Bid Doc #3

Richard Martin Center Roof Renovation & Replacement

Project Manual & Drawings

Project Plans & Drawings

Addendum No. 1 - Cover & Updated Sheet Index

Addendum No. 1 - Plans & Drawings

Addendum No. 1 - Item #9 Addition of Section 02 0820

Addendum No. 1 - Item #9 Addition of Exhibit A

Addendum No. 2 - Cover, List of Drawings, Revisions to Section 01 2000

Addendum No. 2 - Item #1 Drawing A102

Addendum No. 2 - Item #2 Drawing A501

Addendum No. 2 - Item #3 Drawing MEP101

August 10, 2015 August 4, 2015
2016-02 RFQ - Parking Consultant Services August 6, 2015
2016-01

Cleaning & Sealing Cracks in Bituminous Concrete Pavement

Addendum No. 1 - Clarification on bid bond calculation

August 11, 2015 @11:00 am

2015-01 Integrated Government Financial Management Software August 8, 2014

 

2015-05

Bid Document #1

Bid Document #2

Addendum No. 1

 

Solar Photovoltaic System - Winthrop Elementary Magnet School August 19, 2014

August 7, 2014 @ 1:00 P.M.

2015-03

Addendum No. 1

 

87 Octane Unleaded Gasoline August 27, 2014

2015-04

Addendum No. 1

 

Ultra Low Sulfur Diesel Fuel August 27, 2014

2015-06

Addendum No. 1

 

#2 Heating Oil August 27, 2014

 

RCDA

Document

 

Brownfields Site Cleanup Consulting Services September 4, 2014 @ 4:30 P.M.

2015-08

Addendum No. 1

 

Develop City of New London's Five-Year Community Development Consolidated Plan September 8, 2014

 

2015-02

Bid Sheet

Addendum No. 1

 

Copiers and Printers September 29, 2014

 

 

2015-09

Addendum No. 1

Addendum No. 2

Addendum No. 3

NLPD Exterior Concrete Staircase Removal and Replacement October 24, 2014 October 16, 2014 at 11:00 AM

2015-10

Addendum No. 1

Engineering Design Services for the Hydraulic Study of the Bank Street Drainage Corridor December 9, 2014
SCCOG Water Taxi Operator SCCOG Requesting Proposals for Water Taxi Service Operator 4:00 pm., Friday, March 13, 2015

2015-11 RFQ-P

Exhibit H:Contracts AIA DocumentsB101-2007

A201-2007

E203-2013

Exhibit I:Educational Specifications

Exhibit J:Claims Disclosure

Addendum#1

Addendum #2

Addendum #3

Addendum #4

Addendum #5

The City of New London will be accepting qualifications / proposals from architectural firms to provide services for the preparation of construction Documents for the New London High School Campus Project.

 

 

 

 

 

 

 

May 8, 2015 April 17, 2015 at 11:30am to be held at the Science and Technology Magnet High School, Lecture Hall on 490 Jefferson Avenue, New London, CT 06320
2015-12 RFQ Engineering Design Services for the Reconstruction of two (2) Municipal Parking Lots, along Eugene O'Neill Drive May 8, 2015, at 12:00 pm

 

 

2015-13 RFQ

Addendum #1

Brownfield Program Environmental Consultant for Site Assessment and Remediation Planning Services

May 13, 2015

 

 

2015-14 New London Police Dept. Exterior Concrete Staircase Replacement Re-bid July 14, 2015 at 11:00 am July 1, 2015 at 10:00 am